The Blora-Todanan Road Section is Severely Damaged, Here's the Handling Plan

 

blorakoran

INFOKU, BLORA –This is definitely felt by the people of Blora who want to go to the capital city of Todanan District, they will not be able to choose a decent road.

This means that all routes, both Blora – Kunduran – Todanan, and Blora – Ngawen – Japah - Todanan, are currently in poor condition (damaged).

For the Kunduran (Gagaan) – Todanan Line, the road conditions are quite severe in Kedungwaru Village, Kunduran District. Lots of big holes and when it rains it becomes a puddle of water.

According to Bambang, a resident of Kedungwaru who was reported by the media, the road damage in his village has recently been exacerbated by the passing of trucks with over-tonnage loads.

"Trucks that pass sometimes have a large tonnage, thus worsening the condition of roads that have potholes," he explained, Monday (21/03/2022).

Head of DPUPR Blora Samgautama when confirmed stated, for 2022, a budget for the construction of the Kunduran - Goa Terawang road segment has been budgeted for Rp 2.5 billion.

Also read:  While the Pilang-Menden Blora Road Section is being diuruk Grosok

"This year the construction of the Kunduran - Goa Terawang road segment is included in the budget. The amount is Rp. 2 billion, and it is planned with a rigid concrete construction of 400 meters,'' he explained, Monday (21/03/2022).

Meanwhile, from Blora to Todanan via the Ngawen – Japah – Todanan route, the road conditions are also poor.

There is no information yet whether in 2022 there will be a budget for the construction of roads that enter the provincial road.

It is known, in 2022, the Blora Regency Government is committed to making infrastructure development a priority, without forgetting other sectors.

Compared to last year, this year the budget for road infrastructure development will more than double. Precisely at the figure of Rp 260 billion more.

As stated in the 2021 Blora APBD, the road infrastructure budget was around Rp. 106 billion. In 2022, this will reach around Rp. 268 billion.

Also read:  A Translucent Road to Blora - Ngawi will be built via  Randublatung - Getas - Banjarejo - Sonde to Ngawi Toll Road

"The majority of the damaged district roads in Blora will be poured with concrete. This is in line with our previous campaign promise regarding the Dalan Alus program," said Regent Arief Rohman.

He said that apart from the funds, there were still two additional possibilities for infrastructure development that were being pursued.

Arief Rohman asked for prayers from all residents of Blora, hopefully in the 2022 budget amendment later assistance from the Bojonegoro Regency Government can also enter. Namely around Rp 40 billion to support road construction.

In addition, he continued, Blora's struggle to get the Cepu Block Oil and Gas DBH will reap results in 2023.

Blora is optimistic that next year it will get an oil and gas DBH of around Rp. 300 billion, and the funds can be used to boost Blora's infrastructure development in the following year.

Arief Rohman even often talks about how it drains energy to think about the road conditions in Blora, which are heavily damaged, and admits that he has difficulty sleeping thinking about this . (Endah/ IST )

Free counters!

Posting Komentar

Lebih baru Lebih lama