Info Blora
INFOKU, BLORA -The Public Works and Spatial Planning Service (DPUPR) of Blora Regency through the Human Settlements Sector will carry out the construction of a house connection piping network (SR) for Drinking Water Supply System (SPAM) in 12 villages in the local district.
Head of the DPUPR Blora Samgautama Karnajaya, through the Head of Human Settlements Suhartono, explained that the construction was carried out with the 2022 Special Allocation Fund (DAK) budget of the Directorate General of Human Settlements, Ministry of PUPR.
"The source of the 2022 DAK budget. We have conducted a site survey. This is still a tender," he said, Monday (14/3/2022).
The 12 villages are Tamanrejo Village, Kec. Tunjungan 122 SR, ceiling Rp. 579,500,000.
Adirejo Village, Tunjungan District 122 SR, ceiling of Rp. 579,500,000. Cabak Village, Kec. Jiken 122 SR, Rp. 579,500,000 ceiling.
Read also: This is the Integrated Animal Husbandry Model of Cooperation between PT ABGS and UGM
Next, Palon Village, Kec. Jepon 122 SR, limit of Rp. 579,500,000. Semampir Village, Kec. Jepon 122 SR, limit of Rp. 579,500,000.
Then, Kemiri Village, Kec. Jepon 122 SR, limit of Rp. 579,500,000. Gersi Village, Kec. Jepon 122 SR, limit of Rp. 579,500,000.
Kamolan Village, Kec. Blora 122 SR, ceiling Rp. 579,500,000. Temurejo Village, Kec. Blora 100 SR, Rp475,000,000 ceiling.
Furthermore, Sumberagung Village, Kec. Banjarejo 122 SR, ceiling of Rp. 579,500,000. Gedongsari Village, Kec. Banjarejo 100 SR, Rp475,000,000 ceiling and Sendangwungu Village, Kec. Banjarejo 122 SR, ceiling of Rp. 579,500,000. (Endah/ IST )